
The Total Plinth Track concreting done between Vadapalani and Koyambedu Station is 9944 Track mtr. A Total of 7500 mtr Track laying has been completed. A total of 1650 joints for Welding of tracks have been done. 6000 mtrs of Tracks has been handed over to other system contractors.








